Friday, 30 April 2021

Recent addition to Local Rides Page

During a recent route check on NCN63 I took in a ride to Hicks Lodge from my home in Castle Gresley.  Having worked on the local cycle network for quite some time I suppose I take it for granted.  The aim of the ride was to look at options for signing links from Hicks Lodge back to NCN63 in Moira. 

The link from Moira Furnace to Hicks Lodge is not part of the National Cycle Network but by signposting links between the network and places of interest it adds to the user experience.  The new link means there are now around up to 4 miles of extra traffic free cycle routes directly available off the main routes.  

Having enjoyed this particular ride more than I have done in a long time, I felt it was worth making a feature of it in our local rides page.  You can access that page via the home page and links or by clicking here.

From Castle Gresley to Swainspark (which is a link route itself) and on to the NCN63 which is also the Conkers Circuit and then Ashby Wolds Heritage trail, there are several different off road options to get to Hicks Lodge and back.  There are alternative routes around the Ashby Canal and around Donisthorpe Woodland Park, Albert Village Lake and Conkers.  You can do the full trails once at Hicks Lodge, or just cycle around the lake or follow the Gruffalo trail.  You could go round in circles, do a figure of 8 route around Conkers or just take the shortest route depending on time and who is cycling.

With most of these routes bases around railways and canals it is mainly flat with the occasional hill but generally suitable for families.  There are cafes and toilets throughout the route and plenty of points of interest, lots of nature and signs of the industrial heritage of the area.  There are several access points to enjoy the ride shown.

The link signing between Moira and Hicks Lodge will hopefully be done this year by our local team of rangers.

The route mentioned is shown in preview below.  Hopefully a map will be added in the future.





Sunday, 21 March 2021

Early Spring Update / 9 million trees!

Following the snow at the start of the year we can now celebrate the arrival of Spring although even the last weekend in February saw the sun come out and with it a rather large number of users.  Levels of walkers, cyclists and runners normally only seen in the height of summer weekends were out, clearly wanting to enjoy the first weekend of decent weather.

Whilst it is good to see people out enjoying walking and cycling around the local network, we must still proceed with caution and do anything we can to avoid further lockdowns.  As rangers we are not yet doing any group activity but can do a small amount of work individually.  Online, however, we are less restricted.

Vegetation & path work in Moira
A recent update on the Paths for Everyone project was of great interest last week with a notable attendance of very nearly 100 people on a zoom presentation and feedback session.  The presentation provided an update for the Midlands and East which covers a very wide geographical area, hence the large number of rangers on the call.  One of the great parts of being a volunteer for Sustrans is working with rangers from other areas to share advice.  We have several long standing connections with rangers in Derby, The Peak District, Birmingham, Lichfield, Leicester and beyond.

Surface issues near Oakthorpe
The part of our area that was mentioned on the presentation was the work in Burton Town Centre in line with improvements to walking and cycling infrastructure.  There has been another consultation from Staffordshire County Council to discuss the proposals, although the deadline has now passed.

In other online news our friends at the National Forest Company took a novel approach to celebrate the planting of the 9 millionth tree in the National Forest.  This is a huge achievement in the 25 years since the start of the National Forest.  Due to current restrictions the event had to be done virtually and a rather famous cartoon character helped in this special occasion.  To read more, click here.

Tranquil Conkers Basin
The the improvement in the weather I took the chance over 2 weekends to look at 2 different parts of the local network.  The first was the well established section from Church Gresley to Measham for a signing and surface check whilst the second part was looking at new parts NCN63 that will link Swadlincote and Burton.

Luckily there were not many issues noted on the check of the existing areas although the previously reported surface between Donisthorpe and Measham still has some areas that have not fully bedded in.  The surface has improved significantly since it was first installed and much of the loose stone has been compacted through weathering and usage but there are still some areas worth further reporting.  Aside from that there are no significant issues and some areas had been subject to improvement.  The area around the Youth Hostel and Campsite has seen vegetation cut back and the surface cleared around the existing ponds.  Also the vegetation around Conkers Waterside and Approach to Albert Village Lake has been cut back too.

The change of season brings out not only humans but also an increase in the wildlife around the route and particularly the canal.  Moorhens and Coots were noticeably present along with the ducks.

Residential streets used too.
Multiple options but barriers.
The following weekend looked at the future of NCN63 and the important link towards Burton and around Newhall and Swadlincote.  The infrastructure for this is starting to take shape through the partially completed developments aside William Nadin Way.  Whilst still some way from being complete it is good to see some progress with much more to follow.  

With the Paths for Everyone mantra in mind, we are also checking for obstructions that might cause an issue to some users.  It was good to see that barriers that were far too close together previously have been respaced, however, their placement still needs to be scrutinised further.

Still much to do!
The links are not fully complete yet and the link between the 2 estates is currently a narrow footbridge unsuitable for riding over but there will be other links eventually.
Decent wide surface
Even at a state far from completion the developer has already put up cyclist dismount signs on one estate at a junction.  Whilst it is correct that cycling on pavements is not legal for most, putting up such signs before the infrastructure is complete tells me that cycling provision is an added extra rather than the natural focus.  No doubt there will be cars mounting the pavements to park at some point.  They know it's wrong but they don't put signs up telling drivers not to do things.

Aside from that pet of hate of mine, there looks to be plenty of optimism.  The good thing is that the estates look to have a couple of options for cycling and walking through which is good for links and variation too.  Also the surfaces are good.  Hopefully these will not only provide a through route for the National Cycle Network but also encourage people to cycle and walk to local employment areas and schools from this new community and existing local communities around the area.

We will keep readers updated on the progress as it is likely to change frequently.  Once these sections are complete we will keep an eye on progress of the route via the new golf course and through to Park Road in Newhall.  In the other direction we will also monitor work around the new development around the old council depot site.

Stay safe everyone.












Sunday, 3 January 2021

Welcome to 2021




Happy new year to all readers.  I started to write this as a fresh blanket of snow settles over South Derbyshire. I’d originally wanted to post as Autumn drew to a close and the last of the golden leaves deposited themselves onto the ground but a busy run up to Christmas and a general shortage of news put paid to that.

Sparse Vegetation
Unfortunately there has not been a lot of action throughout 2020 understandably, though clearly there has been increase in walking and cycling on parts of the network.

Whilst there have not been many activities happening on he actual surface there have been some notable changes just back from the route near Conkers Campsite, with trees taken out to provide more light on some of the ponds.

With the recent falling of snow, cold weather and subsequent ice I decided to use our local NCN routes as over 50% of users do - by foot.  Our local community magazine in Swadlincote featured a walk written by a local walking enthusiast which also related to the history of the area.  The chosen route featured the section of NCN64 around Church Gresley and have a more leisurely opportunity for a route check.

Icy surface but a pleasant walk
We are looking to do update some local signing soon.  Ideally this is the sort of activity that is good to do as a group but during the restrictions due to Covid this will be done individually when weather conditions are suitable.  With the routes currently wet and muddy we'll be looking to do some remedial work when the weather is better and the rules allow a team based approach.  One of the good things about winter is that the sparse vegetation means that the signs are generally more visible.

Before Christmas we saw some sad news in relation to a group featured on the blog - the campaign for Reopening of the Ivanhoe Line
(CRIL) who were featured in this article on the blog.  Sadly the chairman of the organisation Geoff Bushell recently passed away.  Geoff put a lot of work into the project and showed great passion and determination to raise the profile of the group.   

He was always genuinely pleased that people took an interest in the work of CRIL and appreciated any support given.  Thoughts are with Geoff and his family and friends at this sad time.  I hope his immense work can be continued by others in the organisation and sure it will be.

Hope to update more soon - there is plenty to do.

Monday, 15 June 2020

2020 Summer Update and Staffordshire CWIS consultation

This is the first blog item for quite some time.  2020 has been a year like no other and activities like cycling and blogging have taken a back seat to other priorities.

The effects of Coronavirus are evident throughout the many different forms of media and it has affected us all in some way.  Thoughts go to the families and friends of those who have lost their lives to the virus in particular.  I hope a thorough enquiry is made into the initial response to the pandemic, particularly in relation to the strategies of those countries who appear to have managed to suppress the spread of the virus to a significantly greater extent than here in the UK.

Whilst there are encouraging signs that the rate of infection is decreasing there is still a sense of caution, although for a minority it is debatable whether lockdown ever applied anyway.  Hopefully we can avoid a second wave.

For cycling, walking and general outdoor exercise the situation has led to a noticeable increase in activity.  Clearly when all other options have been restricted and an hour of outdoor exercise was allowed and the weather was nice, people took full advantage of that hour ( or several more in many cases).

The great thing about cycling and walking is that it does allow for social distancing, perhaps not as much as it used to but it is good to see people take steps they wouldn’t normally do.  Hopefully this will encourage people to do so on a regular basis and discover the cycle network but in a safe way, within guidelines.

From a volunteering point of view all group activities were suspended at the start of lockdown and only in the last few days have Sustrans advised we can now volunteer individually on our sections.

Despite not being able to have a network of volunteers on the ground Sustrans have been busy lobbying for changes in cycling infrastructure as always but also involved in promoting schemes such as cycles for key workers.  For more information  click here.

There have been a lot of changes to cycling infrastructure during lockdown, particularly in cities and towns as temporary pop-up cycle lanes have become a common feature.  Money has also been made available for walking and cycling schemes although many schemes were already in a bidding process or had been approved.

As we get more information locally, we’ll share on these pages.  We will be having some online sessions about the Paths for Everyone project too.

In the mean time there is a detailed consultation regarding cycling and walking schemes in Staffordshire which I’m very pleased to see and share. This is part of the Cycling and Walking Investment Strategy (CWIS).  Part of the National Forest area is within Staffordshire and Burton on Trent is a key part of the consultation.  I encourage anyone who has cycled in Burton in particular to have a look at the consultation.  The consultation only runs until 7th July. To read the information around the planned implementation of the scheme click here.

As we get back into cycling and walking the network we’ll be updating with more upbeat articles about our activities.  I’ve also done a quick update of some of the links on the pages on the blog as some were a bit out of date.  I’ve not had the chance to update those in the many posts as yet.

Hope you all enjoy a decent summer of cycling in the National Forest but above all, Stay Safe.

Saturday, 30 November 2019

NCN54 Branston Locks Diversion

Approach to the school based on a wide shared path.
Although most of the National Forest cycling network is based in rural settings there are several built up areas including Burton, Swadlincote and Coalville.  All of these places have seen significant growth over recent years and one area of Burton is going through a particularly significant change which has had a major effect on the National Cycle Network (NCN).

The Branston Locks development is a large mix of industrial and residential development which covers a large section of land between Tatenhill and Shobnall, bordering the A38 and including the Trent and Mersey Canal.  NCN 54 formerly passed through this area as a quiet track called Anglessey Street.  Access to this lane has now been obstructed  by the development and an alternative route has been sought after by ourselves for some time.

Jim signing new entry from Shobnall Road to Callister Way
We discussed several routes around the development and finally had clearance to start signing a route earlier this year.  It is proposed for this route to have proper signage provided by Staffordshire County Council but until this is done we have signed it as best we can with our adhesive signs.

When the Branston Locks development is completed it should feature a number of different cycling and walking routes which could be adopted as NCN54 and hopefully this might follow the Trent and Mersey canal.

The route that has been replaced was good as it was flat, direct and in quite a peaceful rural setting, despite it's proximity to the A38 as it approached the Albion pub.  Whilst the alternative route goes through more built up areas, the vast majority of it is off-road on shared paths.  There are also a few eateries, shops and pubs on the route and it passes close to Branston Water Park.  Though it does intersect some busy roads most of the crossing points are Toucan crossings.

The initial route planning was done by our ranger Jim and after some discussion with one of our Network managers we agreed on a slight tweak.  The signing was done in 2 stages due to a shortage of signs and the need for a second look at one of the key areas within Branston village.

Description of the route (West to East - Tatenhill to Shobnall)

End of cycle route sign despite brand new path to Tatenhill
From Tatenhill, the route makes the most of a new path to John Taylor Free School which starts approximately 300 yards from the junction in Tatenhill.  For some reason this path is not signed as shared and not quite 3 metres wide even though it is clearly a safer alternative to the adjacent road.  The egress from the path in direction of Tatenhill is not ideal, which might be a reason for this.

At the end of the new path the route into Tatenhill is road based.
At the school there is a wide Toucan crossing which now carries the route safely across the road.  The route then follows a shared path through the car park and drop off zone, past the rugby club entrance and along Branston Road then onto Tatenhill Lane.  This shared path is continuous all the way to the Bridge Inn at the Trent and Mersey canal.  Clearly, during school run times, this area will be busy but should be quiet outside of the peak times.

At this point it is necessary to cross over the road and continue down Tatenhill Lane.  This leads to a dead end at the A38 and is relatively quiet though there is a new housing development under construction in this area.  Passage under the A38 is made via a shared path tunnel and there is a link to the nearby Branston Water Park.  The tunnel features some barriers to deter motor vehicles which may be tricky for certain bikes.

Hopefully the future route will feature a nice wide canal towpath
Once through the tunnel the route is on road but through the residential area around Branston Main Street before crossing the main road via a Toucan Crossing at Rykneld Primary School.  After another tricky barrier the route continues onto The Parkway - the main road into Burton from the A38 Branston exit.  At the junction by the Carvery restaurant and adjacent Steakhouse the route crosses the Parkway via a double Toucan crossing and subsequent further Toucan over First Avenue before continuing.

Safe passage under the A38 but mind the barriers.
New signage near canal-side Bridge Inn
The crossing at First Avenue features the most ridiculous cyclist dismount signs (aimed at deterring cyclists from cycling along the rarely used footpath along First Avenue).  They are around the size of a bank card but placed aloft a dedicated post - a completely unnecessary but no doubt significant on-cost to cycling infrastructure.  The picture below shows this, but you may struggle to see it.

Award for the most pointless dismount sign
One part of the new link which gave us cause for concern is the crossing at the roundabout of Second Avenue, near the Corner House and Holiday Inn Express.  Although there is a refuge and it is slightly away from the roundabout, there is no lighted crossing and the roundabout is busy with a 40mph speed limit.  During our check of the signing there were roadworks in place here with the inevitable cyclist dismount signage!

Once over this road the shared path continues along Parkway, crossing Third and Fourth Avenue before a relatively long section to Callister Way roundabout.  Whilst the path is wide, there are sections of vegetation which protrude significantly in some places.

Vegetation narrowing the path!.
At Callister Way the route turns away from Parkway and heads over the Trent and Mersey Canal and through an area yet to be developed, onto an off-road section which rejoins the old section of NCN 54 on the other side of the A38 from the Albion pub close to the Marstons brewery.

The new route will take slightly longer than the old route, perhaps around 20-25 minutes without stopping but does feature a lot more in terms of refreshments and facilities.

We will continue to monitor the new route and also intend to look at routes around Burton next year amongst several other areas.  We'll also be keeping an eye on how the Branston Locks development progresses and ensure that the infrastructure is of NCN standard.










Thursday, 28 November 2019

Bikes on Trains - the debate goes on.

The subject of cycling is one of many debated daily through many social media channels.  Social media certainly provides an outlet for debate; often for frustrations and occasionally some praise!

One recurring theme is about being able to take bikes on trains.  This is often debated on the Facebook page for the National Cycle Network but a recent tweet certainly ignited the debate once more and I feel compelled, albeit with delay, to comment on the events.

We've discussed the issues with taking bikes on trains on this blog.  My experience of taking my bike from Burton to Stafford was ok but there were a few issues even on a short journey as the blog item explains.

Another blog post recently discussed mobility cycling and the fact that bikes are a mobility aid and vital to people who may not be able to walk long distances.

One item that certainly provoked response on Facebook was when LNER (who operate the East Coast Mainline from Kings Cross to Leeds, York, Newcastle and Edinburgh amongst other places) announced the arrival of the new Azuma train.  The Azuma has been brought in to replace an ageing fleet of diesel 125 trains and electric 225 trains.  A similar thing happened on the GWR network from Paddington to South West destinations too.

Whilst the new trains are an improvement in many aspects it is noted that in terms of cycling space they lack the spacious facilities of the 125 which had a large guard's van and the 225 which had a large driving van trailer.

As the poster shows, there is only space for 4 bikes on a 10 coach train and 2 on a 5 coach train on the Azuma.

The type of storage adopted typically used now requires the user to lift the bike up and suspend the bike from a hook mounted high.  This is mainly due to spatial economy.

125s have provided good bike storage since the 1970s
The problem with this is that it is not often easy to fit bikes when fully loaded with panniers (for those travelling long distances) and there is certainly no space for other adapted bikes or tandems.  Whilst I'm not particularly strong I'm fit and able to hang my bike.  Unfortunately not everyone is.  I mentioned above about bikes being a useful mobility aid but not everyone capable of riding a bike is physically capable of lifting a bike.

When browsing Twitter fairly recently my attention as drawn to an issue involving Cross Country trains.  A passenger had tweeted to ask about help to hang the bike as they knew they were not physically strong enough.  It is also not easy to locate someone to help hang the bike on the train and it can be very tricky when a train is crowded, which they often are.  The final response from Cross Country as shown is extraordinarily disappointing in a number of ways and does not inspire confidence, especially as Cross Country are the only operator from Burton on Trent.  Whilst Health and Safety are paramount, the tone of the response is poor. 

It's not all doom and gloom though, as Scot Rail are making some alterations to some older trains on the West Highland Line which is a popular tourist line and popular with cyclists.  More information can be read by clicking here.

It is difficult to see any significant improvement forthcoming on the railway network in the near future but the lobbying needs to continue and hopefully longer term the picture will change.

Tuesday, 26 November 2019

Paths for Everyone - a new perspective - review of Sustrans GC Conference

In September the Sustrans Volunteer Group Coordinators conferences took place in York and Reading.  I took the chance to go to the northern event in my home city of York.  These events are very useful for networking and I'd not had the chance to do this with volunteers from Yorkshire and the North East much.
Micklegate Bar - York

The event took place a short walk from York Station so it saved me the anxiety of trying to book my bike onto the train.  In order to make the trip as cost effective as possible I'd booked split tickets from Burton to Chesterfield and Chesterfield to York due to subsidies through Yorkshire. The reservation system was on the blink but fortunately this didn't cause a problem. Thankfully the train was on time and delivered me to York in a relaxed state on a nice late summer day.

The event itself was well attended with rangers mainly from the north, including Merseyside, Leeds, Tyneside, Northumberland and Scotland.

The notable part of the presentations was a talk by Xavier Brice, CEO of Sustrans.  One of the main themes was to show how important the volunteers are to an organisation like Sustrans and several examples were given.  Mention was made of the recent £21 million given to Sustrans to develop parts of the National Cycle Network and some of the adverse feedback given.  Whilst it is only a small fraction of the amount needed for the whole network it is still a significant figure.

The theme that everybody wanted to hear about was the update on the upgrade of the National Cycle Network - known as Paths for Everyone.    There was an update on standards required going forward and also some discussion on potential de-classification of sections that are classified as poor.  I'm sure there will be more on this particular subject going forward.

The latest update on paths for everyone can be found here.

The other part of Paths for Everyone is ensuring that the network is accessible for all and this involves the removal of barriers from the routes.  There are 16000 in total, so this is a significant challenge.  The first of the workshops attended dug a little deeper into this topic and provided some new perspectives.

A local company called Get Cycling had been invited to show some mobility bikes, whilst a member of the ramblers association brought a tramper along.  The introduction to the workshop was given by Jim who explained the aims of Get Cycling and in particular his own personal story of wanting to be able to take his son cycling but needing adapted equipment to be able to do so.  You can learn a lot more about Get Cycling by clicking here.

The bikes are bought in places like the Netherlands and Germany and refurbished and sold at lower prices than new.  One of the key points that Jim made which really resonated with me was that the speciality bikes are seen as very niche in the UK but in those countries with more developed cycling infrastructure they are much more common place.  Whereas in the UK they would be used mainly for infrequent leisure trips, in other places they are part of everyday life and a necessary part of getting around.

We were encouraged to use the bikes and the tramper to get an idea of how they handle and we were given an insight into adaptations specifically made for certain disabilities.  The point was also made about bikes being an important aid to mobility in general - and how poor infrastructure and barriers in particular can be critical - not all users can lift bikes over obstacles.

The day also featured discussions on successful led rides, attracting funding for small projects and the day ended with a nice social walk around York.


Back in Swadlincote, fresh with inspiration I revisited an area of concern on one of the new developments that will be part of NCN 63 in the future as the network is completed.  I had noticed the installations of some inappropriate barriers and reported this to the planning department at South Derbyshire District Council.  The barriers were so close together that it was only possible to get a bike through - even a normal sized wheelchair or a double buggy would have struggled to pass.  To be fair, although the barriers are still there, they have been amended and are not so ridiculous tight.  The funny part, as the picture shows, is that one set of the barriers are easily passable to the side.

See how close the barriers were!
Whilst the issue has been resolved to some extent it is concerning that new sections of NCN created through development feature these obstacles that are clearly not in the new vision.  Clearly, some form of best design practice needs to be communicated and implemented in order for the NCN to truly be considered as paths for everyone.