Sunday, 26 February 2023

It's nearly Spring! First route check of 2023.

 As much as the Winter seems to drag on, I can't believe that this latest post follows an Autumn post.  The first route check on local parts of the National Cycle Network (NCN) of 2023 took place on a chilly but sunny February day with plenty of signs that Spring is around the corner.

I'd also taken a recent tentative look around the developing route on the Burton side of Swadlincote including a look at progress on the Urban Park.  Whilst there is not much to report further to recent posts, it was good to see that the BMX part of the urban park was nearing completion.  With infrastructure visually well in place the park looks to be well advanced but the fencing still remains.  An opening date is still to be confirmed but will hopefully be done by Easter - updates will be given when known,

So with limited scope for traversing the new sections, a route check on the more established sections was required.  I thought I'd share the experience of a route check in a bit of detail.

Construction of Gresley Meadow development
Starting in Church Gresley with an initial trip up the unforgiving Cappy Hill the route was followed down Thorpe Downs Road out onto the Conkers Circuit and following NCN63 through Gresley Woods towards Swainspark Wood.  As well as checking signage and surface, we also check the surroundings.  Currently a new development called Gresley Meadow is under construction along the back of the Thorpe Downs estate.  The current status of works and movement of earth around the site certainly brings an ironic meaning to the Meadow name.

One of the other issues in the area is the signage of the junction back towards Church Gresley from the circuit.  In February it is visible but due to their set back location, the signs are often obscured when the foliage is green and vibrant again.  Something to keep monitoring with partners around the route.

Onwards through the picturesque Swainspark Wood with it's leaf filled floor.  A slight issue noted with a fallen tree that doesn't present immediate danger but worthy of reporting to Forestry England.  By this point, I'm observing that this dry and sunny day has certainly attracted a fair few people, dogs and horses out for the day, which is nice to see.  

Rural section alongside Gresley Woods

From the cover of the woods, across the road and down the ramp to run alongside the railway line up to Spring Cottage, a little bumpy with tree routes in one spot but nothing too severe.  I negotiate the A-frame barrier at Spring Cottage on it's uphill section before crossing towards Moira Junction.  Hopefully the barriers will be removed soon to allow for the Paths for Everyone philosophy to be enjoyed.  They were all captured on the recent barrier audits for Sustrans.

The section between Spring Cottage and the National Forest Youth Hostel is in good shape - the work done around the Moira Junction nature reserve has really improved the path surroundings.  Again, the railway embankment section is holding up well partly due to work done in the past by probation teams and volunteer work days as well as work done by the local ranger for Leicestershire County Council to reduce overhanging vegetation.

Information board about Donisthorpe Woodland Park

Soon I'm in Donisthorpe Woodland Park.  At this point I'm checking signage behind me as I'll be coming back down the alternative canal route.  First uphill section for a while is from the bridge and s-bend in the middle of the park.  Starting to warm up and a lengthy intake of water.  No major issues and still plenty of people to say good morning to.

Ashby Wolds Heritage Trail near Donisthorpe

At the end of the park I cross the road in Donisthorpe near the church and take the section towards Oakthorpe and Measham.  This section was resurfaced a few years ago with large stones which have taken their time to bed.  My hybrid bike with semi slick tyres is a good test of the surface.  I'm happy with the surface now - it's certainly an improvement on the quagmire it once was and an improved now that the stone surface has bedded in finally.  Passing to the rear of the camping shop on the outskirts of Measham, I muse that it won't be too long before the tents are on display but not today.  The camping shop heralds the end of this uninterrupted section as a large obstacle appears in the near distance.

The A42 was built in the early 1990s before the development of the cycle routes and no provision was made for continuation of the route under the road.  Like the Cloud Trail a few miles further down the A42, a diversion onto paths is required.  Fortunately when the A50 was built, the cycling infrastructure was considered and continues under the road uninterrupted.

On NCN63 there is another half mile stretch of railway section into Measham.  The first part of this has been resurfaced to a good standard and is nice and wide.  The rest is narrower but still decent surface.  The old railway line would have crossed the road in Measham via a bridge to the old station but as the bridge is no longer there the off road section of the route ends.  I follow the route up Measham High Street to the junction with Bosworth Road where NCN 63 continues on quiet country roads towards Newton Burgoland and beyond.  I check the signage and all is good. The route is part of another ranger's section from this point, but I could check it too.  On this occasion I'm keen to check out Hicks Lodge so return back towards Donisthorpe.

"New" section of Ashby Canal in Donisthorpe

I notice nothing major on the way back except for a sign is missing a directional arrow in Measham, so resolve that issue and continue back to Donisthorpe Woodland Park.  This time I take a right turn and head for the new section of canal via the Miners Welfare Centre (or Jungle Madness as most young parents would know it).  Contemplate having a cuppa here but decide to keep going for a bit.

The section along the canal is always pleasant.  It was built in the early 2000s as part of a second section from Conkers where it terminates.  The eventual aim is to link with the more established sections of the Ashby Canal linked to the rest of the canal network.  Currently this terminates between Snarestone and Measham.  I notice plenty of ducks and coots around and also several anglers.  I approach Moira Furnace and lime kilns and get some pictures to capture the reflection of the furnace bridge in the canal.  I bypass the furnace towards the café but then decide to keep going towards Hicks Lodge, over the little swing bridge and out towards Measham Road.

Approaching the unmistakable Moira Furnace 

We have been looking at signing links between Hicks Lodge and Moira Furnace but there is already decent signage in place for users by Leicetershire County Council so no need to oversign.  We're also not keen on the lack of definitive crossing across Measham Road.  A speed check sign has been put in which hopefully ensure the traffic passes at 30mph or lower which is an improvement. I cross without problem and join the shared path on the other side.

1st section of link to Hicks Lodge

1 of several Zog trail boards
The path up to Hicks Lodge is in 2 distinct sections; the first being through a relatively new housing estate.  Now the estate is finished the road has been fully surfaced and raised in parts to meet the kerbs that previously created a hazard. At the top of the estate the path changes direction and goes through an A-gate.  Although not part of the NCN it is worth noting any issues in case of potential expansion of the NCN. Although nothing is currently planned, it is worth noting that a route through Hicks Lodge would provide a route to the outskirts of ever expanding Ashby-de-la-Zouch - a sizeable town not currently on the NCN.

Hicks Lodge cycle centre and café
From the A-gate on Newfields Road the off road link to Hicks Lodge is curvy and undulating which makes it a bit more interesting than most off road links.  It creates a junction with the circular path on the southern side of Hicks Lodge which features the cycling centre and café, lake and car park.

Hicks Lodge bird hide and heritage board
Taking the short anti-clockwise leg to the main building, it is immediately clear that it is busy.  Undeterred, I park up and queue for a tea and rather nice Oreo Brownie.  Whilst enjoying both I notice that the Forestry trail now features the character of Zog.  This is the latest of a series of trails inspired by the books of Julia Donaldson - the first being the Gruffalo a few years ago.

Conkers Waterside & canal basin

Once refreshed I opt to head back towards Moira and the NCN rather than cross the road and take one of the trail routes - mainly due to having fully laden panniers.  I take the long route around the lake before heading back to the furnace.  From there I take the canal side path back towards Conkers Waterside and take a ride over the Marquis Bridge towards the Sarah's Wood side away from the carpark.

From here I continue under the railway bridge alongside the Conka-choo track towards Conkers Discovery side.  The Conka-choo is a little train that links the 2 Conkers sites but is not yet ready for the busy summer season although it does look busy for early February.  The path runs alongside the carpark then up the drive towards Rawdon Road.  Near the top I notice that there is some quite significant tree trunk distortion on the path so make a note to feed this information back to partner organisations.

My route check continues towards Albert Village lake.  At the bottom of the run down from the road the signage looks good.  I opt to go clockwise towards the far side of the lake rather than along the main route along the main shore.  I check out the heritage interpretation board celebrating the local pottery industry before heading back towards Swainspark wood via the red section of the Conkers Circuit.

Information board near the memorial
The Diana Princess of Wales memorial

The reason I took the shortcut back is because I'd checked the section between Albert Village lake and Thorpe Downs Road recently and I thought I'd have a ride to the Diana, Princess of Wales memorial section which is a little off the beaten track.  The memorial is as peaceful as ever with just a couple of dog walkers opting to walk this way.  In the distance is the unmistakable shape of the kilns of the former TG Green pottery.

Back onto the link back to the main NCN route I follow my tracks back to Swainspark wood but take a right turn back towards Tunnel woods and the link back down to Castle Gresley and the end of the route check.

Sunday, 9 October 2022

Autumn Update

 As the leaves start to drop it seems like the extremely hot temperatures of summer were a long time ago.  Fortunately, the weather is still decent for a nice bit of cycling.

Link to Country Park from new estate near Stanton
We’ve recently noted the ongoing progress between Swadlincote and Burton via the new housing developments and the Urban and Country Parks. 

We hope to be able to be report on further progress next year to promote new routes as well as old.  We will do this through the normal social media and blog ways but also hopefully with the support of others.

One of those is the Tourist Information Centre in Swadlincote which has recently re-opened in New Premises on the Delph near the town hall.  The TIC and Gail in particular have been very supportive of our work locally and I am very pleased to see the TIC back in Swadlincote.  The shop open from Tuesday to Saturday currently and not all services are available just now.  Already there are a good number of cycling leaflets on the new display wall.  We wish the TIC team good luck in their new premises and hope to be able to provide more cycling based information over the coming months.  

Already a decent range of leaflets.
I’d also shown concern about a number of articles about the new cycling infrastructure along the A444 within the local press.  Articles noted that the new section was confusing and also concerns about money being wasted and inconvenience caused by the roadworks required for the work to happen.
New TiC opposite the Delph in Swadlincote


Whilst the articles had valid points and I sympathise with drivers being held up in and out of Burton (a key reason I commute by bike) I felt the positivity of the work had been overlooked and there were a lot of comments that were ill informed. 

I am grateful to Samuel from the Burton Mail for taking the time to listen and write a more positive article which can be accessed by clicking here.

What I really wanted to get across was that the section will be part of something much bigger and will be complimented by more links.

As the primarily off-road route between the 2 towns develops it will hopefully lead to an increase in cycling. It is therefore important that the sections along the A444 are improved.

I also wanted to highlight that the imperfections with this particular section were common with most cycling infrastructure - no onward connection and a rejoining of the road.

The point of funding was well mentioned.  It is important to stress how hard funding is to come by and how much competition there is when it is available, so it was important to credit those who secured it and also the team that carried out the work.

I hope that as the routes develop around Burton & South Derbyshire that we can engage more with Samuel and the Burton Mail to spread the more positive aspects of cycling and walking.


Sunday, 14 August 2022

Treefest

 Our work in the local area is well supported by a number of individuals and organisations.  One of those is the National Forest Company who are based near Conkers.

I'd like to share some information about a project currently under way.  Please help spread the word to those who would be interested in this project based on several walks around the National Forest, including Rosliston most locally.

The National Forest is excited to present Treefest – a Connected Treescapes research study in collaboration with the University of Derby, UK Treescapes and Go Jauntly.

 

Treefest aims to explore how the UK’s treescapes affect the public and evaluate how the form and function of these woodland and forests benefit society. This in turn will help to safeguard these environments for future generations and the rest of the natural world. We have designed eight walks across the National Forest, which can be found on the Go Jauntly app (free to download). Participants will be asked a few simple questions before and after the walk, and the data will be analysed by the researchers at the University of Derby to see how different treescapes can support wellbeing. The more people that join in this study, the better the data will be so we’re really keen to get as many people as possible engaged! You can find out more about the study and how to take part here:

 

https://www.gojauntly.com/Treefest

https://findingnature.org.uk/2022/08/02/help-discover-the-benefits-of-trees/

 

As an extra incentive, survey respondents who complete a walk before the end of October will be entered into a free prize draw to win one of twenty £100 vouchers as a thank you for taking part (T&Cs apply).

 

Summer Update 2022

It has certainly been a hot summer so far with some record breaking temperatures.  I write this update having completed another weeks cycling commute in some of the hottest weather I can remember although the morning ride in has been fantastic.

Moira Nature reserve in the sun.
There is a lot of activity around the area at the moment with a new scheme on the A444 in Stapenhill nearing completion and other parts of future parts of the National Cycle network now progressing.  

Away from the actual NCN, Sustrans have been busy in the Urban Core of South Derbyshire as part of a study looking at increasing activity in Primary school aged children particularly in Newhall and Woodville.  Any feedback given to project officer Alistair would be most useful.  I'd like to have been able to help more directly on this but will share as much as I can to help with the project.  Please keep an eye out on the Facebook page and person Twitter feed.

New surface near Measham

During a recent holiday from work I had the opportunity to do a couple of route checks, the first being on part of the future network and around Swadlincote and the urban core and a separate ride looking at the Heart of Forest area.

Both of these involved signage checks and general surface checks and a few signs were updated or replaced where necessary.  It was good to see some surface works have been completed on the section between the A42 and Measham village centre - a small section has been treated and rolled into a nice smooth and wide surface.  I've asked whether this is part of a larger scheme and hope to update further.  It is certainly an improvement on the stony surface put down around 3 years ago between Donisthopre and Measham.  Although the majority of that surface is now bedding in there are still stony sections.

The current link not bike friendly!
Back in Swadlincote progress is being made on the new estate off William Nadin Way which will link the route between Swadlincote and Newhall in the shape of the housing development growing at a pace.  More notable though is that work is now progressing on the Urban Park as previously mentioned in this link.  We continue to monitor progress to ensure that the route is fully accessible when completed.

Work started on Urban Park!
Currently there is still only a pedestrian bridge linking the newest estate with the Cobblestone Drive estate which then links to Swadlincote so hope there is a plan to upgrade this when complete.  Further along the proposed route is a new estate off Park Road, Newhall which is in the early stages of construction and just had a new roundabout built as part of infrastructure.  Suddenly a route which has been in the pipeline for many years is starting to come to fruition.

Once the Swadlincote to Stanton link is fully open this will hopefully encourage more people to cycle between Swadlincote and Burton and the route into Burton from the Derbyshire border is now being upgraded in readiness.  As part of the NCN review for paths for everyone the section through Stapenhill on the A444 does not meet the criteria for NCN standards due to the large amount of traffic using the route.

A sign shows completed estate & infrastructure
With funds secured from Stoke-on-Trent and Staffordshire Local Enterprise Partnership and Sustrams Paths for Everyone scheme, Stafforsdhire County Council have been able to upgrade the route from Sycamore Road through the Saxon Street.  More about the reasoning behind the scheme can be read here.

The scheme has led to roadworks for around 15 weeks which has not always been well received and the local press does seem to focus on the negativity of the impact on traffic rather than the benefits of the scheme in the longer term. 

As a cyclist it clearly has less of an impact as we can dismount and walk past but this has been necessary at times due to the narrowness of the roadworks and no safe overtaking space for most vehicles - as a point of personal safety I've generally chosen to walk around, especially if going uphill.  Also the timings on traffic lights between red and green do not always allow time for cycles to get through, not that the colour of the traffic lights seems to matter to a small minority of drivers during these roadworks judging by some observations.

The scheme is very nearly complete with surface work done and some signage already up.  Once the new toucan crossings are in I will update with a feature on the completed works which look to have been done to a high standard.

The works look great but roadworks very narrow. 

Other schemes under investigation in Burton included a new pedestrian bridge to link Winshill and Stapenhill to the Washlands and this did have a consultation period to evaluate viability.  We'll monitor this for any further updates but it is more a of a longer term aspiration.

Another scheme in Station Street in Burton to improve walking and cycling links in between the Railway Station and town centre has been delayed until early 2023.  This will see a 20mph zone and cycling infrastructure on Station Street.  Again, the way this scheme has been poorly promoted within the local press and attracts a lot of ill-educated comments about whether the money should be used for other things.  The fact is that it is funded through a scheme where the money would have been spent somewhere else if there had not been a good justification to make the improvements.

The worrying aspect of this probable click-bait media approach is that the local newspaper made a point of of counting the number of cyclists one morning.  This was done during a school holiday and period of roadworks due to crucial gas main works so it would be likely that most vehicles would be avoiding the area, including bikes, so was hardly a fair reflection.  Also, in it's current format the road and the behaviour of a small minority of motorists speeding excessively, it will not encourage cycling and that's pretty much the point why the improvements are required.

I'm hoping to engage with the local press to see if we can do something positive once the works are complete.  If this happens, you'll read it here too!






Sunday, 6 February 2022

New Cycling Developments around Swadlincote

Although a lot of our cycle network is based on rural sections around the Heart of the National Forest and the Conkers area, we also monitor more urban sections.  Where possible we try to avoid using roads.  When avoiding roads this is normally done by a shared path.  There are quite a few of these paths now being developed around Swadlincote.

We are monitoring the formation of cyle routes around new developments either side of Swadlincote Town centre and recently carried out a quick check.

The first part of the ride was a check on the new estate off William Nadin Way that will carry NCN63 towards Newhall and Stanton once complete.  The estate features a stone based theme with Ruby, Emerald and Marble amongst the new street names.  The estate has expanded fair bit in terms of houses from when I reported the initial progress last Spring as featured in this link.  However there is nothing more to report in terms of any notable cycling infrastructure but will continue to monitor throughout the coming months.

Explanation Sign
Between the new estates and the route through Swadlincote there have still been no significant changes.  The new development Cadley View Care home looks finished but there have been no noticeable amends to the route carrying NCN63 past the site from Darklands Lane.  The resigning of the route away from Civic Way via Toumlin Drive to the back of the Fire Station has still not been done.  One of our planned early rides next year will look at this more closely.

Picture 1 - looking back towards Ski Centre
Away from NCN63 there is now shared path provision along the new Woodville to Swadlincote Regeneration Route.  This route has recently been completed and will feature housing and industrial use and also form an alternative route for local traffic avoiding the busy Clock Island on the A511 in Woodville.

This means there is an off road cycle route from Morrisons Petrol Station / Ski Centre all the way to the edge of Blackfordby via the relatively new housing estates on the Moira end of Woodville.

Picture 2 - Derby Road Roundabout
I took the chance to ride the new route using the newly created shared path and although I am pleased that there is now a new section of cycling infrastructure there are aspects of the design that are not ideal.

The main issue with the route is that on the new sections and the linking section towards the ski slope, the shared path is only on one side of the road, which does offer an off road route into Swadlincote Woodlands Park as shown in Picture 1. For access to the regeneration route this means that potentially busy roads have to be crossed unnecessarily despite there being ample room for a shared path either side.  Only at the Ski Centre / Morrisons petrol station junction is there a protected toucan crossing.
Picture 3 - Crossing point on new route


The next crossing point as shown in picture 2 is across 2 lanes, a refuge then another lane adjacent to the new roundabout at the former Woodhouse Street junction.  This roundabout looks like it will be busy, so a shared path on the Ski-slope side (an upgrade to an existing path) would be very useful and avoid the need to cross here.

Picture 4 - View towards Woodville
The next point to negotiate is the crossing of Woodhouse Street which is offset from the roundabout and traffic accessing Church Gresley has to use the new by-bass and double back at the first roundabout, but care needs to be taken when crossing.

At this point it looks like the route is now free and easy to ride, however the path on the right hand side towards Woodville is not actually a designated shared path, so following the letter of the law another crossing is necessary as shown in picture 3. This seems a bit daft, particular as the shared path side is punctuated with more junctions, mainly from a local business access points and the shared path is not given priority at these junctions.
Picture 5 - Good wide smooth surface

The surface of the path is new and wide which makes for a good ride up towards the edge of Woodville as shown in pictures 4 & 5 so it is a shame that it is designed to give way frequently at junctions and cross the road more often than necessary.

Currently the area is still under development and the landscape reveals familiar landmarks from new angles.  This includes the kilns of the former TG Green pottery.  As time goes by, these landmarks will be surrounded by new buildings including new housing so it would be beneficial to have shared path access on both sides of the main road rather than instruction to cross as shown in picture 6 looking back towards Swadlincote.

Picture 6 - time to cross again
The route links the estates on the Derbyshire and Leicestershire border with Swadlincote and these estates already carry a shared path to the outskirts of Blackfordby so there is now a continuous shared path / off road route for around 2 miles into and out of Swadlincote. Ideally we'd like to find a suitable link from Woodville back to Route 63 near Conkers but current off road links are only really suitable for walking.

Overall the new route is a much welcome addition to the off road cycling infrastructure locally and should provide safe passage for many cyclists and walkers for commuting and leisure as this area develops over coming years.  The surface of the paths are smooth and well built and will hopefully age well.  However, there are aspects of the design that are questionable and too many enforced crossings, especially given that most of this route is effectively a blank canvas.  Not sure whether this is due to poor design standards or effect of budget requirements and need to compromise.





Saturday, 1 January 2022

Snowdog and Snowman Trail in Swadlincote

 A Happy New Year to readers of the blog.  I blew off a few cobwebs on News Years Day around the Conkers Circuit section of NCN 63 which was a bit muddy in places but very nice in the unseasonably mild weather.

7 Swans Swimming at Green Bank!
Bark the Herald Angels Sing near Town Hall.
On New Years Eve I checked some of the NCN sections around Swadlincote itself and will put more about that in another post soon.  However I must confess my main reason was to take a look at the Snowman and Snowdog trail.

This certainly isn't a typical blog post but the activity takes place around a small part of the local cycle network and is an activity that clearly promotes family time and exercise.  Given the strange couple of years we've all had, it's great to shout about something that has engaged people extremely well, especially young children.  It's also a chance to support some of those who have supported our activities over the years in South Derbyshire as there have been some excellent activities planned over the Christmas period which have been spread out over a longer period as opposed to the normal and well attended lights switch on event. Given recent developments with the pandemic, the decision to do so has been vindicated.

Three French Hens Snowman outside the Library
12 Drummers in Rink Way
The trail itself arrived on the 20th November and is in Swadlincote until 16th January so there is not a lot of time to see it if you haven't already.  The trail is based on Raymond Briggs short film The Snowman and the Snowdog and there are bright sculptures placed around the small town centre.  Each sculpture is uniquely decorated and they all feature an explanation of the sculpture and information about the artist.  They are all based around the 12 days of Christmas theme and have been arranged by South Derbyshire District Council and Wild in Art.

This is a very simple concept but one that has been extremely engaging.  As I've been in and around the town centre I've been amazed at the number of people stopping for photos with the sculptures - even now, weeks after it arrived.  I've been aware of friends who live around Derby or Burton coming over to Swadlincote, some for the first time, to show their children the trail.  Hopefully it has been commercially successful for Swadlincote after a hard couple of years.  Even if not, then it is great to see people out enjoying themselves on something that is free for everyone.
Partridge in a Pear Tree
Eleven Pipers near Ski-slope

You can still pick up trail leaflets from places around Swadlincote (No.2 Coffee house on the Delph is the Trail HQ but other places such as Sharpes Pottery Museum may still have them) or click on the link here to download the information map.  The link will likely expire once the trail finishes.

I've put a few images of the sculptures on but there are a few more to see.

Saturday, 31 July 2021

Several Boosts to Cycling Locally and Nationally

I write this as a pandemic affected 2020/1 Olympics is in progress in Japan.  We've seen another record start for Team GB with unprecedented success in the pool but not so much success in rowing (imagine writing that a few Olympics ago).  The main cycling events are still to come and the hope of more medals to add to the gold and silver in BMX.  In Olympic terms today is now known as Super Saturday and hopefully it will be for Team GB.

This blog article won't bring gold medals but does report some excellent news for cyclists and walkers both locally and throughout the UK.

Firstly there have been changes made to the Highway Code following consultation exercises during the last year.  The main strand of the changes relate to a hierarchy of responsibility.  This places the most vulnerable road users in a collision - pedestrians - at the top of the hierarchy and those most likely to inflict harm - large vehicles - at the bottom.  Those at the bottom of the hierarchy will have more responsibility to reduce danger to other users, whereas currently everyone has the same responsibility, including children.

The changes, if approved by Parliament, will manifest themselves in terms of priority given at crossings and at junctions and aim to underpin a strategy not only to promote safety, but also to support sustainable transport more.  A key message is that everyone is still responsible for their own safety and that of others.

The changes will come into effect this Autumn.  To read more about the changes and reaction from Living Streets, click here.  To read more about the Government response to the consultation click here.

The article from Living Streets mentions the £338million package to boost walking and cycling following the boom in activity over the last couple of years.  This isn't a totally new £338million but is is around a 30% increase from the £257million budget allocation announced last year.

There are several projects within this including bikeability and supporting e-bike initiatives as well as incorporating the proposed Highway Code changes mentioned above.  To see more detail click the link to an article on the Government website.

Meanwhile a £30 million funding stream referred to as the Department for Transport's 2021/22 capability fund has been announced.  This is allocated to all local authorities in England outside of London for active travel purposes.

Sustrans have welcomed the announcement and details some of the projects that will benefit from the investment in an article that can be read by clicking here.  Those projects include some funding of changes within Burton-on-Trent affecting a local section of NCN 63 so hopefully further blog articles will appear soon with more exciting details.

Further along NCN63 there are some more exciting development plans which have recently been made public.  On the outskirts of Swadlincote off William Nadin Way there is a proposed Urban Park with Walking and Cycling at the heart of it's design.  A previous blog article had updated progress on the section between Swadlincote Town Centre and Burton via Newhall.  The proposed park would form one part of the link.

The park is currently subject to planning permission and this is currently under consideration.  To view the documents and/or comment on the application use this link.  Most information is contained within the Landscape, Design and Access Statement which shows maps and artists impressions of the plans.  This document is detailed and well worth a read.

Funding for the park is to come partly from development money from the adjoining housing estates via Section 106 but also depends on successful bids from British Cycling and Sport England.  To achieve the funding the plans needed to match certain design criteria, hence the ambitious nature of the project. The 4 main parts of the 1st phase are:

  • Links to the existing and in progress parts of the National Cycle Network
  • A 1.14km cycle route designed primarily for family use.
  • A pump track ideal for BMX and scooters.  
  • A learn to ride zone - this would be set out like roads but be a safer learning space.
A further phase is planned once established to add landscaping, art trails and extension of the pump track, subject to further funding.
An indication of the plan from the Landscape, Design and Access Statement
The infrastructure itself is very impressive and provides a point of interest and activity on the growing cycle network and will be a significant part of completing NCN63 which will traverse the new developments via several possible routes.  There is potential to link residential communities with the town centre, schools and work places significantly more with this development and encourage Healthier Lifestyles in doing so.

The potential benefits go far beyond this though - it could provide a focal point which would connect residents from existing communities and those from the new developments.  It could also provide a location for a hub of cycling and walking activities that we have advocated and provided in the past.  It's also good to see something that has family use at its heart.  I look forward to seeing this exciting project progress.